bitcoin
Bitcoin (BTC) $ 82,061.99
ethereum
Ethereum (ETH) $ 1,878.98
tether
Tether (USDT) $ 1.00
bnb
BNB (BNB) $ 556.72
xrp
XRP (XRP) $ 2.24
cardano
Cardano (ADA) $ 0.731696
usd-coin
USDC (USDC) $ 1.00
matic-network
Polygon (MATIC) $ 0.216077
binance-usd
BUSD (BUSD) $ 0.998873
dogecoin
Dogecoin (DOGE) $ 0.167196
okb
OKB (OKB) $ 41.24
polkadot
Polkadot (DOT) $ 3.95
shiba-inu
Shiba Inu (SHIB) $ 0.000012
tron
TRON (TRX) $ 0.221836
uniswap
Uniswap (UNI) $ 5.85
wrapped-bitcoin
Wrapped Bitcoin (WBTC) $ 82,036.98
dai
Dai (DAI) $ 0.999596
litecoin
Litecoin (LTC) $ 90.27
staked-ether
Lido Staked Ether (STETH) $ 1,875.61
solana
Solana (SOL) $ 124.82
avalanche-2
Avalanche (AVAX) $ 18.19
chainlink
Chainlink (LINK) $ 13.16
cosmos
Cosmos Hub (ATOM) $ 3.85
the-open-network
Toncoin (TON) $ 2.70
ethereum-classic
Ethereum Classic (ETC) $ 17.78
leo-token
LEO Token (LEO) $ 9.69
filecoin
Filecoin (FIL) $ 2.78
bitcoin-cash
Bitcoin Cash (BCH) $ 348.04
monero
Monero (XMR) $ 206.88
bitcoin
Bitcoin (BTC) $ 82,061.99
ethereum
Ethereum (ETH) $ 1,878.98
tether
Tether (USDT) $ 1.00
bnb
BNB (BNB) $ 556.72
usd-coin
USDC (USDC) $ 1.00
xrp
XRP (XRP) $ 2.24
binance-usd
BUSD (BUSD) $ 0.998873
dogecoin
Dogecoin (DOGE) $ 0.167196
cardano
Cardano (ADA) $ 0.731696
solana
Solana (SOL) $ 124.82
matic-network
Polygon (MATIC) $ 0.216077
polkadot
Polkadot (DOT) $ 3.95
tron
TRON (TRX) $ 0.221836
HomeMiningBitcoin Miner GDA Expands West Texas Facilities With 50 MW Deployment

Bitcoin Miner GDA Expands West Texas Facilities With 50 MW Deployment

Genesis Digital Property Restricted (GDA) is increasing its bitcoin (BTC) mining operations in West Texas with a 50-megawatt (MW) energization improve throughout its Pyote and Vernon websites.

GDA is a non-public firm with workplaces within the United Arab Emirates and america, with a complete energy capability of over 600 MW. Whereas the corporate refused to reveal its complete hashrate, GDA Govt President Abdumalik Mirakhmedov claimed it to be “one of many largest bitcoin mining firms on the planet when it comes to this metric.”

For comparability, Bitdeer (BTDR) one of many largest public bitcoin mining firms when it comes to infrastructure, has virtually 900 MW value of capability, whereas heavyweights MARA Holdings (MARA) and Riot Platforms (RIOT) have greater than 1 gigawatt (GW) every.

GDA’s new deployment contains two 20 MW buildings on the Pyote website, bringing it to 195 MW, and a ten MW container setup on the Vernon website, bringing it to 70 MW. The Pyote website could be expanded as much as 370 MW, based on GDA’s web site.

The bitcoin mining agency will likely be making the most of Texas’ demand-response program, that means that the mining operation will flip off its rigs throughout peaks in electrical energy demand, and be compensated for it.

GDA operates 20 knowledge facilities throughout a number of jurisdictions, together with Texas, South Carolina, Sweden and Argentina. Numerous these facilities depend on inexperienced vitality, together with wind, hydro, nuclear and flared gasoline.

“Bitcoin mining is GDA’s core enterprise. The corporate is presently exploring synergies with different emergent industries, together with AI, to boost and broaden its mining operations,” Mirakhmedov informed CoinDesk.

See also  Bitcoin Mining Struggles in Texas Amid Rising Power Costs from Arctic Freeze

Learn extra: Genesis Digital Property Plans 100% Clear Vitality Mining Heart in Sweden

Disclaimer: Components of this text had been generated with the help from AI instruments and reviewed by our editorial group to make sure accuracy and adherence to our requirements. For extra info, see CoinDesk’s full AI Coverage.

RELATED ARTICLES

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Popular News